Monday, 25 September 2017

Monday 25th

Off to work we go, however in 10 years of the SEA programme we have never commuted to the work site on a boat surrounded by beautiful scenery before. The boys we filled with anticipation and a light bit of fear of the unknown, but we had a great day on site today. It's was not debilitatingly hot but it was hot. Fortunately the roof had been erected before our arrival so we could at least be out of the direct sunlight. Our 2 main jobs for today were; #1 to prepare the second half of the concrete slab, which consisted of screeding aggregate to the correct size, wheel barrowing, leveling and compacting it before covering it with plastic and then laying steel mesh. #2 to construct wall frames for lockup area of the shed, this consisted measuring and cutting top plates, bottom plates, studs and noggins. sounds easy enough but there was 2 issues; the timber is ridiculously hard (we had to pre-drill so we could hammer nails in) and it was a bit twisted. Never the less everyone worked brilliantly and I am confident that we will be able to finish the slab and all of the walls tomorrow. The energy of 16 year olds cannot be underestimated, after a hard, hot day on the tools, many of the boys ventured out to have a surf when we got back to the island, we did get the boat to take them to the break, a justice  reward for their efforts.












3 comments:

  1. Wow great job everyone. You could teach the tradies on the Block a thing or two. Can't wait for reveal day

    ReplyDelete
  2. Looking great boys, the shed that is!!
    Well done! Enjoy!

    ReplyDelete