Friday, 29 September 2017

Saturday 30th

We went to markets this morning, always a great place to take in the local culture and meet some people. Unlike Asian country markets this one was pretty simple; fruit, veg, fish, crabs, very poorly screen printed shirts, hand made bags, overly patterned dresses and a bit of shell jewellery. There was a problem brewing, there was a shortage of beetle nut today. We observed a boat was coming to shore, as it got closer there was a bit of nervous energy building, next thing people are jumping in the water and swimming towards the boat. The crew were pushing them away from the boat, it was the beetle nut boat, very bazaar. I bought the group an ice pole each, seemed like a good idea as it was very humid, works out it was coconut milk with red cordial in it, then frozen, fair to say it was met with a mixed reaction.
We then went of the to site for a couple of hours to finish off a few little things, glue up some surfboards and hand planes. It was great to use a proper space and new machinery to prep the surfboards, prior to this we have been using 40 year old bandsaws that sit on timber boxes to get them to correct height. We now have 8 surfboards at various stages from; glued, cut profile, thicknessed, rails shaped, sanded, fin boxes in and 2 are about to be glassed. After building the storage shelves we moved all the balsa wood, so it is safe, flat and high in the air.
We had organised to go to a local club to watch the AFL grand final, half the guys were interested and half were not fussed but fate would decide and the club could nit get reception, so it did not happen. After lunch back on the island many of us went for a snorkel and watched the dark storm clouds rolling from a distance. I have been assured that NRL grand final is on a different channel and will definitely be aired tomorrow. there will be a riot if it does not as league is considered their national sport.







Friday 29


Myself, Mr Jeffery, Gordon, Coulter as well as Mark, Joel and Cleo were up on a 5:45 am boat to meet a special visitor to Kavieng. The Rugby League World Cup Trophy was on it's PNG tour to drum up excitement for the competition. After the plane arrived we were out on the tarmac along with local school kids and elders, who welcomed the trophy to New Ireland Province. Out the front, a few hundred locals and a five strong police car convoy were in to join the buzz as the trophy was placed in the back of the Ute, and left off on it's tour. We were met at the work site by the rest of the team and worked to finish off the build. Tasks completed included: Hanging the doors, coating the exposed timber with some Cabot's, built some hand-planes and continued making surfboards, made a glassing room, as well as made benches and surf board racks. Next, it was time for our 12:50 showdown at the town Courthouse Oval, watched on by the World Cup and hundreds of locals, against the Our Lady of the Sacred Heart, Kavieng guys, (or should I say manchilds). In the brutal heat and sweat, after some contentious calls by Mr Coulter with the whistle (clearly crumbling under the home ground support), we went down 2 tries to 1. An afternoon surf was on the cards again and a boat trip out to Raul island saw some sunset waves in over 15+ metre water vis. It was back in time for dinner and some 'sting pong' before bed.
Ben.


  





 



 
 






Thursday, 28 September 2017

Thursday 28th

We had a cracking storm last night, it left us with an overcast cooler day, which was a welcome change. After a few good days on the site, we made the call to split the team today and have a half half day, half our team in the AM and the other half in the PM. When not on the work site the boys enjoyed a relaxing swim and enjoyed an old school movie "Ferris Buellers day off". When on site we; built windows, doors, finished the iron cladding and built a space for the surfboards to be fiber glassed. The afternoon crew took a while to find their groove and their door took a little longer than expected but they were having fun and branded themselves 'the door crew'. A few people started to make their balsa surfboards and they look great. The block of land were we are building on has a family living behind it and it is a joy to watch the young children running around playing with each other, then other times you will stop your work with a strange feeling you are being watched, because you are, 10 adults standing at the fence watching everything. Today one of our boys gave the kids those party whistles, the noise was like a 5 year old birthday (I'm sure these kids parents will be cursing us tonight). By late afternoon the call of let there be light was made, and there was, the shed has working lights, power and is almost ready for production.
Yesterday I introduced the swear jar to encourage language and choice of words appropriate for a saint Augustine's representative, its a bit of fun and a good way to make us all accountable, the fine is 10 kena ($5) after dinner we all had to own up to what we thought our fine for the day should be and the crowd would decide if it was a fair account. We raised 270 kena today, hopefully this amount will reduce as time goes on. We now need to find a worth cause to donate it to, maybe the local school. Also the inaugural kangaroo court was held this evening, a chance for 2 parties to put their cases forward to a jury of their peers to be ruled on. For example, a staff member was attacked with a sea cucumber while enjoying a snorkel today, later that afternoon the attacker may have been pushed into the water by said staff member as he was waiting for the boat, you decide?? No money or punishment it dispensed just the vindication that your were in the right.
We have organised for everyone to go night fishing with locals over the next few night, tonight after dinner 7 of the team grabbed their head torches and motored off into the darkness, hopefully they will return with a plethora of fish, and the competition begins.








Wednesday, 27 September 2017

Wednesday 27th

Ahhh Wednesday, hump day, everyone has gone hard for 2 days, the bodies are getting a little weary and it seems like the end of the build is still a long way off. Our aim today way to start putting the wall cladding on, unfortunately the building supplies were not there ready for us to go, so the early morning motivation window was missed and it is hard to get it back as the day wore on, never the less we pushed through. We had quite a storm halfway through the day, everyone had to grab all the bags and equipment to get it under cover, it took a little bit of heat out of the air but then when the sun came back out the humidity returned with vengeance. The machinery that was sent from Australia arrived yesterday so that was an interesting exercise for a few of the boys to put it back together (instructions are for overrated). A few people started to cut and make their balsa wood hand planes and surfboards today. The iron cladding is fiddly to fit around windows and doors but it does seem to go up pretty quickly once we got the hang of it and the teams become more efficient at their roles. The electrical team ran all the wire for power points and lights ready to be connected in the next couple of days.








Tuesday 26th

After a great first day, the teams were keen to finish their jobs of concreting and framing. I gave everyone the option to swap around but they were insistent they wanted to see their section through. It was very hot and still today, not he most ideal conditions to be mixing and barrowing concrete, however they did it efficiently and without complaint, in fact hey were so good they finished a couple of hours earlier than I had expected. The framers just plugged away. We have about 8 work experience young carpenters with us on site and I am enjoying watching the interaction between our boys and them, in a way they are both at the same skill set and often they are working it out together. The lunch call has become a favorite time of the day, not necessarily for the food (even though it has been great) but rather it is an opportunity to take a guilt free break and relax. On the way home today we stopped by the local supermarket to stock up on junk food, it will not be an everyday occurrence so the boys took advantage of the opportunity. On return to our island the swell was pretty flat so most of us cooled down in the water and had a bit of a snorkel. We are all pretty tired after two big days and in theory should crash tonight, I suppose it will depend on how much soft drink is consumed? 








Monday, 25 September 2017

Monday 25th

Off to work we go, however in 10 years of the SEA programme we have never commuted to the work site on a boat surrounded by beautiful scenery before. The boys we filled with anticipation and a light bit of fear of the unknown, but we had a great day on site today. It's was not debilitatingly hot but it was hot. Fortunately the roof had been erected before our arrival so we could at least be out of the direct sunlight. Our 2 main jobs for today were; #1 to prepare the second half of the concrete slab, which consisted of screeding aggregate to the correct size, wheel barrowing, leveling and compacting it before covering it with plastic and then laying steel mesh. #2 to construct wall frames for lockup area of the shed, this consisted measuring and cutting top plates, bottom plates, studs and noggins. sounds easy enough but there was 2 issues; the timber is ridiculously hard (we had to pre-drill so we could hammer nails in) and it was a bit twisted. Never the less everyone worked brilliantly and I am confident that we will be able to finish the slab and all of the walls tomorrow. The energy of 16 year olds cannot be underestimated, after a hard, hot day on the tools, many of the boys ventured out to have a surf when we got back to the island, we did get the boat to take them to the break, a justice  reward for their efforts.












Sunday, 24 September 2017

Sunday 24th

We woke to a wonderful day, the colours in the water are amazing and our accommodation is even better in the light. Today is an orientation day, look around our island, get used to the way things are done over here, get used to the heat and even squeeze in a surf. A few of us went over to the build site to lock in our plan of attack for tomorrow. We briefed the boys and they are ready for the big day and early start of working tomorrow. The students were welcomed by Nathan, Exley and Simon (local children), and after playing some footy with the young boys, it was time for the first of many snorkels, in the 26 degree water, looking at some of the beautiful corals. After lunch, we ventured out to a sweeping left break with some boys faring a lot better than others over the reef, and 200 metre paddle. Simon, (only 14), decided it would be good to get us some coconuts, so climbed a 20 metre palm tree, and walked up a 10 metre leaning one, throwing down 20 fresh coconuts in the process. Next, it was time for a hotly contested game of cards where Joel took home the glory, in what Mr. Gordon is adamant was a stitch-up. As usual, we were fed well for dinner, and as I write, Nathan, our two year old local friend, Is throwing hats and running on top of the dinner table, clearly buzzing from the quarter of a coke can we gave him. We are ready for 6 days of work ahead, in weather that is proving to be hot and incredibly humid. Time passes incredibly slowly here and the pace life is lived at is something completely different to ours. Ben Copping